Abbreviations & Terminology

Abbreviations

 
Abbreviation Description
CQ (RCQ) Consequence (Residual Consequence)
HAZID Hazard Identification
HAZOP Hazard Operability Study
HIRA Hazard Identification Risk Assessment
PR (RPR) Probability (Residual Probability)
RAM Risk Analysis Method
RC Matrix Risk Classification Matrix
Rev Revision
RR Risk Register
RRS Residual Risk Score
RS Risk Score
TRA Task Risk Assessment

Terminology

Term Description
Assessment Category

Category that is used in HIRA, TRA & Risk Register RC Matrix to assess against.There are 4x Assessment Categories within the RC Matrix Default Template (each can be edited if required):

  • Personnel
  • Environment
  • Assets
  • Reputation
Consequence Outcome of an event.
Event Occurrence or change of a particular set of circumstances.
HAZID (Hazard Identifcation) An assessment to evaluate hazards at a conceptual stage to allow for mitigation to be factored into the design process / procedures.
HAZOP (Hazard & Operability Study) An assessment to review and identify hazards and operability issues within a procedure, defined operation or activity.
HIRA (Hazard Identification Risk Assessment) A 'higher level' risk assessment that can be utilised to assess hazards and required controls for a series of activities that link to form a process.
Probability Chance of an event occurring.
Project RISKUL system area where projects are configured and worked on.
RAM Worksheet Worksheet displayed in tabular format in which the User inputs the required information into pre-defined fields to develop the RAM.
Review Frequency Period of validity set by the User when configuring a RAM within a Project. The period countdown commences once the RAM is approved. RISKUL has 5x review frequencies to choose from.
Risk An uncertain event or condition that, if it occurs, has a positive or negative effect on objectives.Risk is derived from the Probability of an event occurring and the Consequence of that event.
Risk Acceptance Level Terms of reference against which the significance of risk is evaluated. Risk Score / Residual Risk Score transferred to a classification value (Low, Medium or High).
Risk Analysis Method (RAM) Method selected to identify & mitigate hazards and manage risk. There are 5x RAM within RISKUL - HAZID, HAZOP, HIRA, TRA, Risk Register.
Risk Classification Matrix (RC Matrix) Matrix used to assign a Risk Acceptance Level based on the allocated Probability vs Consequence. Assessed against an Assessment Category.
Risk Register A register used to identify, collate, track and mitigate risk associated with all elements of a Project.
Risk Score (Residual Risk Score) Value attained from Consequence vs Probability which corresponds to a Risk Acceptance Level.
Stage

The current stage at which a RAM is set. RISKUL has 4x stages to choose from:

  • Draft
  • In Review
  • Approved
  • Retired
Status The current status of RAM row content; Open, Ongoing, Closed, Transferred.
Summary (Page) User & system generated content compiled into a standard format. Shown as the first page / section for each RAM.
TRA (Task Risk Assessment) An operational / functional risk assessment used to identify hazards in specific activities by assigning a risk classification using Consequence & Probability to provide a subjective Risk Score that allows a Risk Acceptance Level to be applied.
User

A User is a person who has access to RISKUL, Users have different permissions to work in RISKUL. There are 2x types of User:

  • Project Admin
  • User